11:32

On June 23, President of the Republic of Azerbaijan Ilham Aliyev attended the inauguration of a sand filter-free water treatment facility in the city of Yevlakh.
Chairman of the State Water Resources Agency Zaur Mikayilov informed President Ilham Aliyev about the project for the reconstruction of Yevlakh’s water supply and sewage systems.
The project is designed to improve drinking water supply and wastewater services for 70,000 residents, taking into account the city's prospective development until 2035. Under the project, the construction is planned of a drinking water treatment plant with a capacity of 20,000 cubic meters per day, 139 kilometers of drinking water network, nearly 13,000 household connections, 115 kilometers of wastewater network, and 5 pumping stations. Additionally, a treatment facility with a daily capacity of 12,500 cubic meters will be built to purify and discharge the city’s wastewater.
As part of the project, a sand-free rapid filtration treatment facility with a daily capacity of 20,000 cubic meters has already been constructed on the bank of the Kura River to ensure a reliable drinking water supply to the city. The plant has 16 filters installed and includes two water reservoirs with a total capacity of 2,500 cubic meters for storing treated water. The facility is equipped with special pumps for disinfection and backwashing processes, as well as a transformer and generator to ensure energy supply. Furthermore, an 86-kilometer-long water distribution network has been constructed, and 4,230 household connections with water meters have been installed.
Yevlakh’s water supply and sewage systems were originally established in the 1950s and 1960s. The city’s main water sources were sub-artesian wells and the Kura River. The 15 sub-artesian wells currently in operation could no longer meet demand. Despite repeated maintenance and capital repairs, the two 27-kilometer-long main pipelines from the well zone to the city were unable to provide sustainable water supply. Water drawn from the Kura River using pumps was only partially treated before being distributed to consumers. The existing 191-kilometer-long water distribution network in the city had deteriorated after years of use and could no longer meet demand.
Dear Mr. President,
On the occasion of the National Holiday of Mongolia, I extend my heartfelt congratulations to you and, through you, to your entire people on behalf of myself and the people of Azerbaijan, and convey my best wishes.
We attach great importance to...
11 July 2025, 11:00Within the framework of the Armenia–Azerbaijan peace process, a bilateral meeting between President of the Republic of Azerbaijan Ilham Aliyev and Prime Minister of the Republic of Armenia Nikol Pashinyan will take place on July 10 in Abu Dhabi, the United Arab...
09 July 2025, 12:00Dear Mr. President,
We were deeply shocked by the news of the devastating floods in the state of Texas, which have caused numerous casualties and destruction.
In light of this tragedy, I extend my deepest condolences to you, the families and loved ones of those who...
08 July 2025, 16:47Dear Mr. President,
On my own behalf and on be half of the people of Azerbaijan, I extend my sincere congratulations to you and your entire nation on the occasion of the national holiday of the Bolivarian Republic of Venezuela – Independence...
05 July 2025, 11:00